Sustainability Management Activity Zone (SMAZ)
Malik Khalfan (Salford)
Tasks related to sustainability
were identified and refined for the whole construction process
at project level and
were integrated with the Process
Protocol (a generic design and
construction process map). The overall aim was to develop these
activities thus
bringing awareness of sustainability to the construction process
and its practice at a specific project level. The main purpose
of developing SMAZ was to make sustainability one of the management
areas within the Process Protocol, which would then drive all construction
projects towards more sustainable construction practices.
Development of SMAZ
SMAZ was first developed in the form of a matrix
and then further refined into a full activity zone within the Process
Protocol at Loughborough University, UK.
The final version of SMAZ’s first and second
level of activities is the outcome of the following: a literature
review; analysis of C-SanD Project’s first and second round
of interviews; participation in real project meetings of industrial
partners; review of available sustainability checklists, indicators
and assessment tools; in-house workshops with the C-SanD project
team at Loughborough University; and further validation with 20
construction related organisations. The criteria, which was used
to identify and putting the activities in place, was to see the
relevance in terms of; how those activities affect the whole or
part of construction process at project level; how the affects
and changes be measured and monitored; how they are related to
the wider sustainability objectives; and how they fulfil the needs/requirements
of client/customers and current legislation.
Once the basic framework was developed and checked
through in-house workshops, it was validated within the construction
industry to check its relevance, practicality, and use. Organisations
such as local councils, consultants, contractors, etc. took part
in the validation process. The validation was done in two stages:
the first stage involved about half of the selected organisations
and resulted in an interim version of SMAZ; the second stage then
involved the rest for further refinements. The selection of the
organisations was random, except for the C-SanD project partners.
Download pdfs of SMAZ activities
|